# Brisbane's New Bus Network (Brisbane Bus Network Reviews)

**URL:** <https://forum.bettertransportqueensland.org/t/brisbanes-new-bus-network-brisbane-bus-network-reviews/459>\
**Category:** Greater Brisbane\
**Tags:** infrastructure, buses, brt, timetables\
**Created:** [11 May 2025 10:10 UTC](https://forum.bettertransportqueensland.org/t/brisbanes-new-bus-network-brisbane-bus-network-reviews/459 "2025-05-11T10:10:55Z")\
**Posts on this page:** 1\
**Showing post:** 319

<div class="post-metadata">

**Author:** ![sherooda](https://forum.bettertransportqueensland.org/letter_avatar_proxy/v4/letter/s/ba8739/32.png) [@sherooda](https://forum.bettertransportqueensland.org/u/sherooda)\
**Post date:** [4 April 2026 03:45 UTC](https://forum.bettertransportqueensland.org/t/brisbanes-new-bus-network-brisbane-bus-network-reviews/459/319 "2026-04-04T03:45:13Z")

</div>

> [@Brisbane Metro](https://forum.bettertransportqueensland.org/t/brisbane-metro/71/739):
>
> If the 329 would get extended to Sandgate, would it make a viable overlay of the 326, except that the 329 will serve the western catchment of Carseldine station while the 326 serves the east? Edit: Now that I think of it, I feel like the 329 should cover Phillips St instead while the 326 covers Gawain St. I don’t know if BCC has the resources to do considering that the 329 is so pathetic in its current form: there are only 10 services each weekday and the route is less than 6km long!

---

_[View the full topic](https://forum.bettertransportqueensland.org/t/brisbanes-new-bus-network-brisbane-bus-network-reviews/459)._
