# Cross River Rail (CRR)

**URL:** <https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177>\
**Category:** Greater Brisbane\
**Tags:** heavy-rail, infrastructure\
**Created:** [18 January 2025 00:32 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177 "2025-01-18T00:32:43Z")\
**Posts on this page:** 20\
**Page:** 4

<div class="post-metadata">

**Author:** ![ClevelandLine](https://forum.bettertransportqueensland.org/letter_avatar_proxy/v4/letter/c/51bf81/32.png) [@ClevelandLine](https://forum.bettertransportqueensland.org/u/ClevelandLine)\
**Post date:** [3 June 2025 22:43 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177/61 "2025-06-03T22:43:18Z")

</div>

I figure that QR just has to take whatever date is given to them by DTMR or CRRDA.

It’s the job of the media to scrutinise and provide context.

---

<div class="post-metadata">

**Author:** ![rowangray](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/rowangray/32/5835_2.png) [@rowangray](https://forum.bettertransportqueensland.org/u/rowangray)\
**Post date:** [3 June 2025 23:04 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177/62 "2025-06-03T23:04:40Z")

</div>

Here’s some pictures from my very brief (like 2 minutes) stop at Exhibition on the first train. Off to work for me now 😆

 ![20250604_090203](https://d2ncxwic62bt2e.cloudfront.net/original/2X/8/87a1f6bf9b09005442b25671d7870bfa651645e2.jpeg)  
 ![20250604_090155](https://d2ncxwic62bt2e.cloudfront.net/original/2X/3/38ca8e6c8172ff0585ad88c78d1b74e5aeb7735b.jpeg)

---

<div class="post-metadata">

**Author:** ![rowangray](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/rowangray/32/5835_2.png) [@rowangray](https://forum.bettertransportqueensland.org/u/rowangray)\
**Post date:** [3 June 2025 23:08 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177/63 "2025-06-03T23:08:28Z")

</div>

Here’s a video passing by the northern tunnel portel.

---

<div class="post-metadata">

**Author:** ![Ozbob](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/ozbob/32/1784_2.png) [@Ozbob](https://forum.bettertransportqueensland.org/u/Ozbob)\
**Post date:** [3 June 2025 23:17 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177/64 "2025-06-03T23:17:09Z")

</div>

^ video is not rendering. Both Vivaldi and Edge " This video cannot be rendered because your browser does not support the codec. "

---

<div class="post-metadata">

**Author:** ![ilovebrizvegas](https://forum.bettertransportqueensland.org/letter_avatar_proxy/v4/letter/i/5f8ce5/32.png) [@ilovebrizvegas](https://forum.bettertransportqueensland.org/u/ilovebrizvegas)\
**Post date:** [3 June 2025 23:17 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177/65 "2025-06-03T23:17:32Z")

</div>

Thanks for posting those! I was hoping someone would since it’s a bit hard for me to get across from New Zealand to see it…

---

<div class="post-metadata">

**Author:** ![rowangray](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/rowangray/32/5835_2.png) [@rowangray](https://forum.bettertransportqueensland.org/u/rowangray)\
**Post date:** [3 June 2025 23:18 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177/66 "2025-06-03T23:18:18Z")

</div>

Im sure we’ll get some better photos soon! Someone else will go for longer (_curse having to go to work!_)

---

<div class="post-metadata">

**Author:** ![ilovebrizvegas](https://forum.bettertransportqueensland.org/letter_avatar_proxy/v4/letter/i/5f8ce5/32.png) [@ilovebrizvegas](https://forum.bettertransportqueensland.org/u/ilovebrizvegas)\
**Post date:** [3 June 2025 23:19 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177/67 "2025-06-03T23:19:55Z")

</div>

Work is so overrated right? 😜

---

<div class="post-metadata">

**Author:** ![rowangray](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/rowangray/32/5835_2.png) [@rowangray](https://forum.bettertransportqueensland.org/u/rowangray)\
**Post date:** [3 June 2025 23:20 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177/68 "2025-06-03T23:20:56Z")

</div>

The platforms are very wide. Excellent for when events are on!

---

<div class="post-metadata">

**Author:** ![ilovebrizvegas](https://forum.bettertransportqueensland.org/letter_avatar_proxy/v4/letter/i/5f8ce5/32.png) [@ilovebrizvegas](https://forum.bettertransportqueensland.org/u/ilovebrizvegas)\
**Post date:** [4 June 2025 00:19 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177/69 "2025-06-04T00:19:28Z")

</div>

What are your initial thoughts for how it would handle crowds from a stadium at Victoria Park?

---

<div class="post-metadata">

**Author:** ![rowangray](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/rowangray/32/5835_2.png) [@rowangray](https://forum.bettertransportqueensland.org/u/rowangray)\
**Post date:** [4 June 2025 00:47 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177/70 "2025-06-04T00:47:46Z")

</div>

Given the distance stadium goers would have to walk, I think it would be able to sufficiently handle the PAX given a high enough frequency.

---

<div class="post-metadata">

**Author:** ![Andrew21](https://forum.bettertransportqueensland.org/letter_avatar_proxy/v4/letter/a/e56c9b/32.png) [@Andrew21](https://forum.bettertransportqueensland.org/u/Andrew21)\
**Post date:** [4 June 2025 00:58 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177/71 "2025-06-04T00:58:49Z")

</div>

Are you able to exit the station at the moment without going to the event?

---

<div class="post-metadata">

**Author:** ![rowangray](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/rowangray/32/5835_2.png) [@rowangray](https://forum.bettertransportqueensland.org/u/rowangray)\
**Post date:** [4 June 2025 01:05 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177/72 "2025-06-04T01:05:22Z")

</div>

Not sure, sorry. I didnt have a chance to go down into the concourse.

---

<div class="post-metadata">

**Author:** ![rowangray](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/rowangray/32/5835_2.png) [@rowangray](https://forum.bettertransportqueensland.org/u/rowangray)\
**Post date:** [4 June 2025 01:58 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177/73 "2025-06-04T01:58:03Z")

</div>

I’ve heard that the platform can hold 1200 people _comfortably_. Considering thats a little over a trains worth of people, I imagine the platform can hold more than that, however perhaps they will limit it to around 1200 people for safety.

It’s surprising that it doesnt have platform screen doors / gates though. I’d like to see them retrofitted prior to the olympics if it is going to be the main station serving Vic Park.

---

<div class="post-metadata">

**Author:** ![SeekTraining](https://forum.bettertransportqueensland.org/letter_avatar_proxy/v4/letter/s/dec6dc/32.png) [@SeekTraining](https://forum.bettertransportqueensland.org/u/SeekTraining)\
**Post date:** [4 June 2025 02:12 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177/74 "2025-06-04T02:12:35Z")

</div>

I imagine PSDs were not implemented at Exhibition to allow non QTMP/NGR trains to use the station (ie steam specials for Ekka, etc)

---

<div class="post-metadata">

**Author:** ![nathandavid88](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/nathandavid88/32/1258_2.png) [@nathandavid88](https://forum.bettertransportqueensland.org/u/nathandavid88)\
**Post date:** [4 June 2025 03:09 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177/75 "2025-06-04T03:09:41Z")

</div>

I agree, and given that there are already numerous comments across the station’s social media posts asking if the Ekka Steam Trains will be back this year (with “watch this space” replies from QR), it’s a valid reason IMO.

---

<div class="post-metadata">

**Author:** ![rowangray](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/rowangray/32/5835_2.png) [@rowangray](https://forum.bettertransportqueensland.org/u/rowangray)\
**Post date:** [4 June 2025 07:19 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177/76 "2025-06-04T07:19:21Z")

</div>

I will reupload with a different codec when I get the chance 👍

---

<div class="post-metadata">

**Author:** ![Verbatim9](https://forum.bettertransportqueensland.org/letter_avatar_proxy/v4/letter/v/eb9ed0/32.png) [@Verbatim9](https://forum.bettertransportqueensland.org/u/Verbatim9)\
**Post date:** [4 June 2025 09:09 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177/77 "2025-06-04T09:09:37Z")

</div>

Apparently they are going to extend the platform to its full length before the games.

---

<div class="post-metadata">

**Author:** ![Verbatim9](https://forum.bettertransportqueensland.org/letter_avatar_proxy/v4/letter/v/eb9ed0/32.png) [@Verbatim9](https://forum.bettertransportqueensland.org/u/Verbatim9)\
**Post date:** [6 June 2025 07:56 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177/78 "2025-06-06T07:56:07Z")

</div>

[![](https://d2ncxwic62bt2e.cloudfront.net/original/2X/1/197c87075b87a2d51592afe01aebb248cf984d23.jpeg "Around the Sites April 2025 - Roma Street station") ](https://www.youtube.com/watch?v=0yi7jhwS6NA)

---

<div class="post-metadata">

**Author:** ![sherooda](https://forum.bettertransportqueensland.org/letter_avatar_proxy/v4/letter/s/ba8739/32.png) [@sherooda](https://forum.bettertransportqueensland.org/u/sherooda)\
**Post date:** [6 June 2025 08:06 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177/79 "2025-06-06T08:06:59Z")

</div>

I really don’t understand that CRR won’t be open until 2029. Apart from the stations that are taking shape, the only bit remaining is to lay some southbound CRR track at Mayne and do some rearranging of the tracks south of Albion. I don’t really know what else they need to do in 4 more year?

---

<div class="post-metadata">

**Author:** ![Verbatim9](https://forum.bettertransportqueensland.org/letter_avatar_proxy/v4/letter/v/eb9ed0/32.png) [@Verbatim9](https://forum.bettertransportqueensland.org/u/Verbatim9)\
**Post date:** [6 June 2025 08:20 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177/80 "2025-06-06T08:20:34Z")

</div>

Must be due to the signalling rollout as well as rolling stock and capacity improvements on the Gold coast line that’s holding it up.

[Previous page](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177.md?page=3)

[Next page](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177.md?page=5)
