# Cross River Rail (CRR)

**URL:** <https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177>\
**Category:** Greater Brisbane\
**Tags:** infrastructure, heavy-rail\
**Created:** [18 January 2025 00:32 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177 "2025-01-18T00:32:43Z")\
**Posts on this page:** 1\
**Showing post:** 995

<div class="post-metadata">

**Author:** ![ari](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/ari/32/92_2.png) [@ari](https://forum.bettertransportqueensland.org/u/ari)\
**Post date:** [6 August 2026 10:22 UTC](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177/995 "2026-08-06T10:22:17Z")

</div>

> [@2026-08-06: Roma St Platform 1](https://forum.bettertransportqueensland.org/t/2026-08-06-roma-st-platform-1/1693):
>
> Translink has confirmed that the new Roma Street Busway platform 1 will open on the 10th of August, as upgrade works on the station progress. The new platform will be accessible from within the station entrance, eliminating the confusing and time-consuming walk out of the station required by the previous arrangement. BTQ is pleased to see these works progress, ensuring that Roma Street station provides high quality transfer locations for users of both buses and trains. Facebook Instagram [http…](https://www.instagram.com/p/DbsfBqht7qv/?utm_source=ig_web_copy_link&igsh=NTc4MTIwNjQ2YQ==)

---

_[View the full topic](https://forum.bettertransportqueensland.org/t/cross-river-rail-crr/177)._
