# Story Bridge has been closed to Pedestrians/cyclists since TC Alfred, no update from council on when it will reopen

**URL:** <https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408>\
**Category:** Research & Data\
**Tags:** buses, cycling, walking, urban-design\
**Created:** [13 April 2025 03:14 UTC](https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408 "2025-04-13T03:14:35Z")\
**Posts on this page:** 20\
**Page:** 1

<div class="post-metadata">

**Author:** ![as-saffarini](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/as-saffarini/32/319_2.png) [@as-saffarini](https://forum.bettertransportqueensland.org/u/as-saffarini)\
**Post date:** [13 April 2025 03:14 UTC](https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408/1 "2025-04-13T03:14:35Z")

</div>

> **[Sudden closure of Story Bridge to cyclists shows ‘car is still king in Brisbane’](https://www.theguardian.com/australia-news/2025/apr/13/sudden-closure-of-iconic-bridge-to-cyclists-shows-car-is-still-king-in-brisbane)**
>
> Bike riders say they were given no notice about shutdown and have not been told when route will reopen, leaving many facing long detours or choosing to drive

Title says it all, I wasn’t aware that this had happened, it seems really ridiculous how car-centric the bridge already was with barely any buses using it despite the fact it connects two of the most population dense suburbs being connected by it.

As a personal anecdote I actually use to live on the very edge of South Brisbane, right next to kangaroo point and every time I had to go somewhere in Kangaroo point google maps almost always told me to just walk because none of the buses went anywhere near there, and while I could have walked I’m not a very physically active and prefer taking a bus even if it takes a bit longer, so I found the lack of any option pretty ridiculous, and people I know who live there or in east Brisbane and commute to UQ are basically stuck with walking all the way to Woolloongabba busway station because the buses there are so infrequent.

---

<div class="post-metadata">

**Author:** ![Axilya](https://forum.bettertransportqueensland.org/letter_avatar_proxy/v4/letter/a/ea5d25/32.png) [@Axilya](https://forum.bettertransportqueensland.org/u/Axilya)\
**Post date:** [14 April 2025 06:13 UTC](https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408/2 "2025-04-14T06:13:27Z")

</div>

Agreed. I used to live at the southern end of KP, and the the only decent bus service was at the Gabba Busway Station. There’s now the 234 bus (which has somewhat replaced the southern end of the 475; it no longer goes to Buranda, but now services the northern part of the peninsula), but it only runs every 20 minutes.

Ferries are somewhat useful for where they go, but their coverage is quite limited.

---

<div class="post-metadata">

**Author:** ![Ozbob](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/ozbob/32/1784_2.png) [@Ozbob](https://forum.bettertransportqueensland.org/u/Ozbob)\
**Post date:** [16 April 2025 00:37 UTC](https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408/3 "2025-04-16T00:37:52Z")

</div>

https://www.facebook.com/plugins/post.php?href=https%3A%2F%2Fwww.facebook.com%2Fcrtrinamassey%2Fposts%2Fpfbid0M192ExiTD3SKZad8vdh1fzWyAZXVSM82nPB3iG2PQGortrLz6kMUUdqfzVgPcQpGl&show_text=true&width=500

---

<div class="post-metadata">

**Author:** ![rowangray](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/rowangray/32/5835_2.png) [@rowangray](https://forum.bettertransportqueensland.org/u/rowangray)\
**Post date:** [16 April 2025 09:30 UTC](https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408/4 "2025-04-16T09:30:03Z")

</div>

This is really troubling. There are footpaths on either side. There is no good reason for both sides to be closed simultaneously. It just goes to show… **👑 Car is still King in Brisbane 👑**.

---

<div class="post-metadata">

**Author:** ![Keryn](https://forum.bettertransportqueensland.org/letter_avatar_proxy/v4/letter/k/b77776/32.png) [@Keryn](https://forum.bettertransportqueensland.org/u/Keryn)\
**Post date:** [20 May 2025 11:38 UTC](https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408/5 "2025-05-20T11:38:10Z")

</div>

Brisbane Times are drawing attention to the closed footpaths. It’s paywalled but the headline and tagline make the point:  
[Here’s what walking the council’s Story Bridge footpath detour is really like](https://www.brisbanetimes.com.au/national/queensland/here-s-what-walking-the-council-s-story-bridge-footpath-detour-is-really-like-20250506-p5lwwy.html): “It is possible to take council’s detour since it closed the Story Bridge footpaths more than two months ago. But would you want to?”

---

<div class="post-metadata">

**Author:** ![nathandavid88](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/nathandavid88/32/1258_2.png) [@nathandavid88](https://forum.bettertransportqueensland.org/u/nathandavid88)\
**Post date:** [21 May 2025 03:16 UTC](https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408/6 "2025-05-21T03:16:55Z")

</div>

Due to the pressure on the Brisbane City Council regarding the footpaths closure, and apparent claims of a coverup, council are releasing the documentation regarding the maintenance of, and required works to, the Story Bridge footpaths.

> **[Story Bridge documents released amid cover-up claims](https://www.brisbanetimes.com.au/national/queensland/story-bridge-documents-released-amid-cover-up-claims-20250520-p5m0qs.html)**
>
> Under pressure to come clean over its sudden decision to close the bridge’s footpaths, Brisbane council is releasing all of its reports on their maintenance and restoration.

> [@](#):
>
> During Tuesday’s council meeting, infrastructure chair Andrew Wines tabled a stack of papers he said was “all of the reports on the footpath that I have in my possession”.
> 
> The reports – seen by this masthead and expected to be accessible on the council’s website next week – deemed several parts of the bridge an “extreme risk” to the public.

---

<div class="post-metadata">

**Author:** ![alexjago](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/alexjago/32/49_2.png) [@alexjago](https://forum.bettertransportqueensland.org/u/alexjago)\
**Post date:** [24 May 2025 12:42 UTC](https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408/7 "2025-05-24T12:42:12Z")

</div>

> **[Space4cyclingbne](https://www.facebook.com/space4cyclingbne/posts/pfbid02aQxGsDsyoqj6TTTK3bHL1gEBkJBXU5ZAZ6j7oU3ZL8mRY9kDNMuZGkftiodTtaA9l)**
>
> Wow. Apparently Brisbane City Council have not made any formal submission to the Queensland Government requesting help funding the Story Bridge restoration. At least that’s according to Queensland...

A few interesting points made by Space4CyclingBNE a few days ago:

- BCC haven’t asked State govt for help yet
- outer lanes on the bridge are limited to 2.5t GVM anyway so buses, trucks and the heaviest cars aren’t allowed to use it anyway

I guess the questions are, should BTQ take a (public) position on this and if so what should the position be?

---

<div class="post-metadata">

**Author:** ![Verbatim9](https://forum.bettertransportqueensland.org/letter_avatar_proxy/v4/letter/v/eb9ed0/32.png) [@Verbatim9](https://forum.bettertransportqueensland.org/u/Verbatim9)\
**Post date:** [24 May 2025 12:55 UTC](https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408/8 "2025-05-24T12:55:45Z")

</div>

[![](https://d2ncxwic62bt2e.cloudfront.net/original/2X/b/bde38312252715ba1551f8dc56ee1c0b0821223e.jpeg "Story Bridge in CRISIS: What's next?") ](https://www.youtube.com/watch?v=u9dXO7sPVqU)

The Brisbane Channel goes into depth about it and dispells a lot of myths and toxic politicking going around.

---

<div class="post-metadata">

**Author:** ![Andrew21](https://forum.bettertransportqueensland.org/letter_avatar_proxy/v4/letter/a/e56c9b/32.png) [@Andrew21](https://forum.bettertransportqueensland.org/u/Andrew21)\
**Post date:** [27 May 2025 13:05 UTC](https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408/9 "2025-05-27T13:05:53Z")

</div>

> **[Court bid to stop 'Extinction Rebellion on wheels' blocking bridge](https://www.abc.net.au/news/2025-05-27/police-challenge-protesters-over-story-bridge-blockade/105343068)**
>
> Police will appear at the Brisbane Magistrates Court on Thursday to argue that the march, which would block all six traffic lanes, should not go ahead.

Seems like Friday morning could turn out to be fun. At least the new bridge over to Alice St is now open so you don’t have to go all the way around to Southbank anymore. Still a substantial detour, especially for pedestrians.

---

<div class="post-metadata">

**Author:** ![GonzoFonzie](https://forum.bettertransportqueensland.org/letter_avatar_proxy/v4/letter/g/47e85d/32.png) [@GonzoFonzie](https://forum.bettertransportqueensland.org/u/GonzoFonzie)\
**Post date:** [27 May 2025 14:28 UTC](https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408/10 "2025-05-27T14:28:47Z")

</div>

> [@alexjago](#):
>
> I guess the questions are, should BTQ take a (public) position on this and if so what should the position be?

Obviously the only solution would be to close the bridge as soon as possible and begin the repairs.

BTQ’s position should be to advocate for the Story Bridge to converted to a green bridge and close the bridge to traffic completely and any restorative works should possibly include reinforcing the bridge to handle buses and/or light rail.

---

<div class="post-metadata">

**Author:** ![Axilya](https://forum.bettertransportqueensland.org/letter_avatar_proxy/v4/letter/a/ea5d25/32.png) [@Axilya](https://forum.bettertransportqueensland.org/u/Axilya)\
**Post date:** [27 May 2025 18:22 UTC](https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408/11 "2025-05-27T18:22:31Z")

</div>

I’m going to have to disagree with that position.

The Story Bridge is an important freight route for the inner suburbs, especially for DGs that cannot be transported through tunnels.

Making it a green bridge would result in more heavy vehicles going through the heart of the CBD (Turbot/Ann Sts) to access the Riverside Expressway and Captain Cook Bridge.

---

<div class="post-metadata">

**Author:** ![nathandavid88](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/nathandavid88/32/1258_2.png) [@nathandavid88](https://forum.bettertransportqueensland.org/u/nathandavid88)\
**Post date:** [28 May 2025 00:24 UTC](https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408/12 "2025-05-28T00:24:24Z")

</div>

I agree with Axilya, I would not advocate for the Story Bridge to be converted to a green bridge in any way, shape or form.

This is not like kicking two limited use car lanes off the Victoria Bridge, the Story Bridge is a 6 lane arterial “highway” that forms an important part of the inner city ring road network. It allows vehicles from the south to access the inner northern suburbs without travelling through the CBD or using the tunnels, which aren’t suitable for all vehicles, loads or destinations (and vice versa as well).

Closing this bridge would be an absolute traffic disaster for the inner city!

---

<div class="post-metadata">

**Author:** ![as-saffarini](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/as-saffarini/32/319_2.png) [@as-saffarini](https://forum.bettertransportqueensland.org/u/as-saffarini)\
**Post date:** [28 May 2025 04:36 UTC](https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408/13 "2025-05-28T04:36:49Z")

</div>

I received an email this morning from a Brisbane activist newsletter about this protest and I honestly am thinking about heading over to there, and reporting back to the forum if anything interesting happens. What do you guys think?

Also want to add that I really think that if one of the lanes shouldn’t even be taking heavy vehicles anyway I don’t see how dedicating one lane to pedestrians would cause much of a problem, really it would probably buy time for the council to fix it because a pedestrian/bike lane would damage the bridge a lot less.

---

<div class="post-metadata">

**Author:** ![Jonno](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/jonno/32/558_2.png) [@Jonno](https://forum.bettertransportqueensland.org/u/Jonno)\
**Post date:** [28 May 2025 04:38 UTC](https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408/14 "2025-05-28T04:38:06Z")

</div>

Close No.

Have separated transit lanes and bike lanes in addition to the footpath (shared paths are not bike paths) - Yes.

Return the approaches back to a less “freeway on/off ramp” roads including the Shafton’s Avenue flyover - Yes.

---

<div class="post-metadata">

**Author:** ![Ozbob](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/ozbob/32/1784_2.png) [@Ozbob](https://forum.bettertransportqueensland.org/u/Ozbob)\
**Post date:** [28 May 2025 05:29 UTC](https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408/15 "2025-05-28T05:29:24Z")

</div>

I think it will be non event. I understand Queensland Police and the BCC will be seeking court injunctions to block the protest. The organiser of the protest has said she will obey any injunctions.

---

<div class="post-metadata">

**Author:** ![as-saffarini](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/as-saffarini/32/319_2.png) [@as-saffarini](https://forum.bettertransportqueensland.org/u/as-saffarini)\
**Post date:** [29 May 2025 02:24 UTC](https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408/16 "2025-05-29T02:24:51Z")

</div>

Update: the organiser cancelled the march due to the court ruling the protest to be unauthorised.

> **[PM says Commonwealth shouldn't have to fund Story Bridge repairs as court...](https://www.abc.net.au/news/2025-05-29/brisbane-story-bridge-protest-blocked-by-court/105351068)**
>
> Organisers had planned to blockade all six lanes in a call for a dedicated cycling and pedestrian lane. Footpaths on the Story Bridge have been closed since March. 

---

<div class="post-metadata">

**Author:** ![Jonno](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/jonno/32/558_2.png) [@Jonno](https://forum.bettertransportqueensland.org/u/Jonno)\
**Post date:** [29 May 2025 07:26 UTC](https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408/17 "2025-05-29T07:26:29Z")

</div>

All Hail the Car and bow in its Mighty presence!!

---

<div class="post-metadata">

**Author:** ![Verbatim9](https://forum.bettertransportqueensland.org/letter_avatar_proxy/v4/letter/v/eb9ed0/32.png) [@Verbatim9](https://forum.bettertransportqueensland.org/u/Verbatim9)\
**Post date:** [18 June 2025 07:09 UTC](https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408/18 "2025-06-18T07:09:54Z")

</div>

> Pending a new deck, one side of the Story bridge is predicted to be open to pedestrian and cycling traffic by the end of the year

(Brisbane Times, 2025).

> **[The winners and losers in the Brisbane City Council budget](https://www.brisbanetimes.com.au/national/queensland/the-winners-and-losers-in-the-brisbane-city-council-budget-20250617-p5m82r.html)**
>
> What’s in the budget for you? Here’s some of the winners and losers out of Brisbane City Council’s 2025-26 budget.

---

<div class="post-metadata">

**Author:** ![GonzoFonzie](https://forum.bettertransportqueensland.org/letter_avatar_proxy/v4/letter/g/47e85d/32.png) [@GonzoFonzie](https://forum.bettertransportqueensland.org/u/GonzoFonzie)\
**Post date:** [18 June 2025 13:35 UTC](https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408/19 "2025-06-18T13:35:45Z")

</div>

Why increase rates if you are not going to fix the damn bridge properly?

This band-aid approach is political bullshit.

> [@nathandavid88](#):
>
> Closing this bridge would be an absolute traffic disaster for the inner city!

It gonna have to happen one day like it or not. There is no other way to fix bridges with serious problems the Story Bridge has. The longer you put it off, the more expensive it gets.

---

<div class="post-metadata">

**Author:** ![nathandavid88](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/nathandavid88/32/1258_2.png) [@nathandavid88](https://forum.bettertransportqueensland.org/u/nathandavid88)\
**Post date:** [18 June 2025 23:22 UTC](https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408/20 "2025-06-18T23:22:35Z")

</div>

Partial/temporary closures of the bridge for restoration works =/= a full and complete closure of the bridge permanently.

[Next page](https://forum.bettertransportqueensland.org/t/story-bridge-has-been-closed-to-pedestrians-cyclists-since-tc-alfred-no-update-from-council-on-when-it-will-reopen/408.md?page=2)
