# Train signalling upgrade - ETCS 2 rollout

**URL:** <https://forum.bettertransportqueensland.org/t/train-signalling-upgrade-etcs-2-rollout/208>\
**Category:** General\
**Tags:** heavy-rail, discussion\
**Created:** [27 January 2025 00:08 UTC](https://forum.bettertransportqueensland.org/t/train-signalling-upgrade-etcs-2-rollout/208 "2025-01-27T00:08:36Z")\
**Posts on this page:** 1\
**Showing post:** 58

<div class="post-metadata">

**Author:** ![sherooda](https://forum.bettertransportqueensland.org/letter_avatar_proxy/v4/letter/s/ba8739/32.png) [@sherooda](https://forum.bettertransportqueensland.org/u/sherooda)\
**Post date:** [27 September 2026 10:35 UTC](https://forum.bettertransportqueensland.org/t/train-signalling-upgrade-etcs-2-rollout/208/58 "2026-09-27T10:35:20Z")

</div>

> [@Shorncliffe line Shennanigans](https://forum.bettertransportqueensland.org/t/shorncliffe-line-shennanigans/523/74):
>
> Should be testing at a higher frequency, such as a train every 15min all day compared to every 30min (or every 10min under wonderland cases). Isn’t that the main point of ETCS at the end of the day?

---

_[View the full topic](https://forum.bettertransportqueensland.org/t/train-signalling-upgrade-etcs-2-rollout/208)._
