# Why active transport is so import for public transport

**URL:** <https://forum.bettertransportqueensland.org/t/why-active-transport-is-so-import-for-public-transport/104>\
**Category:** Research & Data\
**Tags:** trams, cycling, heavy-rail\
**Created:** [4 January 2025 21:00 UTC](https://forum.bettertransportqueensland.org/t/why-active-transport-is-so-import-for-public-transport/104 "2025-01-04T21:00:51Z")\
**Posts on this page:** 3\
**Page:** 1

<div class="post-metadata">

**Author:** ![Jonno](https://forum.bettertransportqueensland.org/user_avatar/forum.bettertransportqueensland.org/jonno/32/558_2.png) [@Jonno](https://forum.bettertransportqueensland.org/u/Jonno)\
**Post date:** [4 January 2025 21:00 UTC](https://forum.bettertransportqueensland.org/t/why-active-transport-is-so-import-for-public-transport/104/1 "2025-01-04T21:00:51Z")

</div>

From Melissa & Chris Bruntlett

_Strengthening bike-train connectivity to the rest of the Randstad metropolitan region, Dordrecht Station has undergone a facelift with the addition of a two-storey parking facility for 1,880 bicycles, which doubles as a covered entrance for passengers approaching from the south through Weizigtpark._

_The bike parking is designed according to best practice developed by Dutch railways: 1. Proximity to platform, 2. Always open spaces, 3. Secure and socially safe, 4. Good movement and flow, 5. Comfort and ease of use, 6. Always free of charge, 7. Sheltered from weather, and 8. Sustainable materials._

_As the Netherlands’ first circular bike parking facility, the structure is modular, expandable, and rebuildable, so it can be relocated and reused if required—as a whole or individual parts. Electricity is generated via mono-crystalline cells in the transparent solar roof, making it energy-positive._

_Looking beyond the turnstile, the scope also included infrastructural upgrades to help passengers arrive comfortably by bike. The cycling routes to the station have been widened and improved, while tall bushes have been replaced by low plants and new lighting installed to increase the social safety._

_This unique project is the first step in the metamorphosis of Dordrecht Station with the planned addition of 10,000 new homes by 2030. By combining both sustainable mobility and construction, it ensures current residents can flourish without comprising the ability of future residents to do the same._

> **[Log in to Facebook](https://www.facebook.com/share/p/19oxmfVgGi/?mibextid=wwXIfr)**
>
> Log in to Facebook to start sharing and connecting with your friends, family and people you know.

---

<div class="post-metadata">

**Author:** ![Verbatim9](https://forum.bettertransportqueensland.org/letter_avatar_proxy/v4/letter/v/eb9ed0/32.png) [@Verbatim9](https://forum.bettertransportqueensland.org/u/Verbatim9)\
**Post date:** [31 January 2026 08:43 UTC](https://forum.bettertransportqueensland.org/t/why-active-transport-is-so-import-for-public-transport/104/2 "2026-01-31T08:43:15Z")

</div>

A post was merged into an existing topic: [Active Transport](https://forum.bettertransportqueensland.org/t/active-transport/88)

---

<div class="post-metadata">

**Author:** ![Verbatim9](https://forum.bettertransportqueensland.org/letter_avatar_proxy/v4/letter/v/eb9ed0/32.png) [@Verbatim9](https://forum.bettertransportqueensland.org/u/Verbatim9)\
**Post date:** [31 January 2026 08:43 UTC](https://forum.bettertransportqueensland.org/t/why-active-transport-is-so-import-for-public-transport/104/3 "2026-01-31T08:43:15Z")

</div>


