Ideas for the what’s next - post CRR, faster Beenleigh to Kuraby B2K (Logan to GC upgrade), Direct rail to Sunshine Coast, and faster Beerburrum to Nambour (B2N). These four upgrades are due to finish in the next two to three years and will incl level 2 ETSC system integration. So where too from 2030?
Complete level crossing removals, methodically, one by one,
Build Skygate station and track duplication for Airtrain,
Reopen the Tennyson line to passengers, in a circuit loop, ETSC enabled to allow closer trains without timetable clashes (Yerongapilly/GC trains),
Build Varsity Lakes to Coolangatta Airport (GC),
Duplication of the Cleveland line (from Manly),
Station accessibility upgrades, all remaining stations based on patronage (highest to lowest), and other/s? All of the above and more!
I see the works programme as a combo of network-edge branches / extensions and middle-suburbs track amplification. (Amplification: Exhibition to Elimbah, and Boggo Rd to Kuraby.) This will allow shifting a line out of CRR to better use capacity on the subs (as Ferny Grove to Cleveland doesn’t need a whole CBD track pair).
@jimmyBoy I’ve just edited your post slightly to make the list nice
Dual platforms for all stations from Beerwah to Cooroy.
Improvement of line running speeds where possible. I know many points of the network have been slowed down over time. An example is I’d like to see 120km/h speeds for as much of the line from Northgate to Caboolture as possible.
I would hope at least some of these projects could be done at the same time. At this point I would then look at other network expansions (Flagstone, Coolangatta, northern suburbs - either Trouts Road or Chermside, Toowoomba).
Varsity to GC Airport (possibly Tweed but unlikely given NSW track record on cross border projects)
A lot of the Gold Coast stations (pre-CRR) are very large but boring! I think some face lifts could make them look so much nicer. Robina could benefit from large artworks with the platforms facing large blank walls.
Toowoomba Heavy Rail
A new express service for Gold Coast to Brisbane. Varsity Lakes → Helensvale → Roma → Central
I can’t remember where I read it but a few years ago someone wrote that the Gold Coast corridor has the ability for trains to operate at 160km/h (currently capped at 140km/h). If that is the case…
Same with the Sunshine Coast Line from Caboolture to Beerburrum (and eventually on to Beerwah, then Birtinya).
I know on paper the time savings are only a few minutes especially as the timetable has enough padding to allow for basically EMU speeds (100kmh), but as more and more of the network becomes capable of 160, we should have rollingstock that can utilise this.
Also though:
Quad tracks to Petrie (or development of the NWTC for heavy rail).
Triples to Caboolture to potentially allow for peak direction express SC trains that overtake the Caboolture all stoppers (noting that some stations won’t allow for this so maybe partial triplication).
Extension of Springfield line through to Ipswich via Ripley to create a loop potentially.
Extension/expansion of Rosewood line to accommodate the ongoing suburban development west of Ipswich.
New line out to Beaudesert (utilising the XPT/Freight corridor which would need to be duplicated and electrified)
I’m gonna say it… extend the Redcliffe Peninsula line so that it actually terminates in Redcliffe, by tunneling 3km east and building an underground terminus right next to the RSL.
Establishment of a fully funded and empowered SEQ Public Transport Authority…can we please, for the love of God, start to take Brisbane/surrounds seriously!
Agreed the Central upgrade is well overdue as soon as CRR opens with the spare capacity considering platforms 1 & 2 will only be used by Cleveland services they should start that immediately.
I agree on the GC station upgrades especially given that like Helensvale is the busiest station outside of Brisbane!
This is one that I’ve mentioned a couple times here and although it sounds a bit wacky and quite complicated…
Remake Airport Junction for connection to CRR.
I know, I know, sounds utterly silly, but I’m still not fully convinced about how CRR will remove the historic GC - BNE connection only for it to be given to… Ipswich?
The current Airport junction is also a bit of a mess, being flat and blocking movements on the suburban pair, limiting throughput for T4 services to Northgate and Shorncliffe.
I see an opportunity to bring the whole Eagle Junction area back to the drawing board, with a more efficient grade-separated junction flyover for airport services, an easier connection to Doomben (if it doesn’t get converted to a busway…), a full rebuilding of EJ (with a renaming to Kalinga while at it), etc, etc.
But I do firmly believe that the first thing to do post-CRR is the full quadrupling of Sector 1 for both north and south. Non-negotiable.
People say that few loadings from BNE reach the Gold Coast because most get off in central Brisbane but I still think the amount of loadings reaching Gold Coast would be greater than any other distal terminal. I highly doubt Ipswich is going to exceed GC’s loadings reaching BNE
OOL isn’t really even a defence against cutting GC’s direct access to BNE because BNE is still the overwhelming amount of SEQ’s international flight loading
I can’t see it working in any viable way but I’d also support maintaining GC’s direct connection to BNE
Quad tracking between Kuraby and Boggo Road with the removal of all the level crossings. At a minimum if they don’t want to redo just completed parts Quad tracks between Kuraby and Coopers Plains that’s where most of the removal crossings are anyways
I would also say with a GC station upgrades they need to look at parking Helensvale and Hope Island are considerably bad. Hope Island you often can’t get a car park past 7 am
You can say the same for most if not all the Gold Coast stations. Let’s say they increased parking upwards instead of outwards (which would be preferable).
Many of these stations are connected via roads that are a single lane each way, meaning the roads connecting them chockers in morning/afternoon rush hours. More parking would be nice but the traffic on the local connecting roads is already so bad.