QR priorities (SEQ)

Ideas for the what’s next - post CRR, faster Beenleigh to Kuraby B2K (Logan to GC upgrade), Direct rail to Sunshine Coast, and faster Beerburrum to Nambour (B2N). These four upgrades are due to finish in the next two to three years and will incl level 2 ETSC system integration. So where too from 2030?

  1. Complete level crossing removals, methodically, one by one,
  2. Build Skygate station and track duplication for Airtrain,
  3. Reopen the Tennyson line to passengers, in a circuit loop, ETSC enabled to allow closer trains without timetable clashes (Yerongapilly/GC trains),
  4. Build Varsity Lakes to Coolangatta Airport (GC),
  5. Duplication of the Cleveland line (from Manly),
  6. Station accessibility upgrades, all remaining stations based on patronage (highest to lowest), and other/s? All of the above and more!
1 Like

Hopefully will be achieved before 2032 but at least 15 minute frequency off peak and weekends across all lines

3 Likes

I see the works programme as a combo of network-edge branches / extensions and middle-suburbs track amplification. (Amplification: Exhibition to Elimbah, and Boggo Rd to Kuraby.) This will allow shifting a line out of CRR to better use capacity on the subs (as Ferny Grove to Cleveland doesn’t need a whole CBD track pair).


@jimmyBoy I’ve just edited your post slightly to make the list nice :slight_smile:

3 Likes

Toowoomba extension would be good

2 Likes

Tram extension to Robina

2 Likes

I think a good next step would be maximising the potential of the network so it’s well set up for future growth and expansion:

  • Cleveland line duplication with bus/metro interchange at Birkdale for eastern metro services.
  • Boggo Road to Kuraby quadruplication with potential Sunnybank/Pinelands deviation to improve speed and travel times and proper bus/rail interchange.
  • Ripley/Yamanto extension
  • Darra to Corinda fourth track electrification and changing track layout from Darra to city for UU/DD running.
  • Improvements to junction at Corinda with perhaps flyovers to improve efficiency with freight and passenger services.
  • Indooroopilly station rebuild with new bus interchange for western/centenary suburbs
  • Rebuild of Darra and Milton station with two island platforms for UU/DD running.
  • Shorncliffe line duplication and second platform at Shorncliffe.
  • Doomben duplication (at least partial) and extension to Hamilton Northshore.
  • Airport line duplication to Skygate with new station.
  • Rebuild of Windsor station to provide a seamless interchange with bus/metro services on Lutwyche Road.
  • Capacity improvements northern line (Northgate to Caboolture) and decent bus/metro interchange at Carseldine.
  • Station accessibility upgrades.
  • Closure of a handful of stations no longer needed - Wynnum, Bindha, Gailes, Holmview, Traveston).
  • Merger of a handful of stations that are spaced too close together - for example, Runcorn and Fruitgrove, Enoggera and Gaythorne, Hendra and Ascot).
  • Central and Bowen Hills station upgrades
  • Selected level crossing removals (Wynnum Central, Coorparoo, Runcorn stretch, Wacol, Strathpine, Mitchelton etc).
  • Dual platforms for all stations from Beerwah to Cooroy.
  • Improvement of line running speeds where possible. I know many points of the network have been slowed down over time. An example is I’d like to see 120km/h speeds for as much of the line from Northgate to Caboolture as possible.

I would hope at least some of these projects could be done at the same time. At this point I would then look at other network expansions (Flagstone, Coolangatta, northern suburbs - either Trouts Road or Chermside, Toowoomba).

5 Likes

Here’s my wishlist

  1. Level boarding at Central.
  2. Varsity to GC Airport (possibly Tweed but unlikely given NSW track record on cross border projects)
  3. A lot of the Gold Coast stations (pre-CRR) are very large but boring! I think some face lifts could make them look so much nicer. Robina could benefit from large artworks with the platforms facing large blank walls.
  4. Toowoomba Heavy Rail
  5. A new express service for Gold Coast to Brisbane. Varsity Lakes → Helensvale → Roma → Central

I can’t remember where I read it but a few years ago someone wrote that the Gold Coast corridor has the ability for trains to operate at 160km/h (currently capped at 140km/h). If that is the case…

  1. Trains running at 160km/h on the Gold Coast line.
1 Like

Rationalisation of Cleveland Line (see Lindum to Manly skyrail foam thread) and then duplication is on the wishlist

Same with the Sunshine Coast Line from Caboolture to Beerburrum (and eventually on to Beerwah, then Birtinya).

I know on paper the time savings are only a few minutes especially as the timetable has enough padding to allow for basically EMU speeds (100kmh), but as more and more of the network becomes capable of 160, we should have rollingstock that can utilise this.

Also though:

  • Quad tracks to Petrie (or development of the NWTC for heavy rail).
  • Triples to Caboolture to potentially allow for peak direction express SC trains that overtake the Caboolture all stoppers (noting that some stations won’t allow for this so maybe partial triplication).
  • Extension of Springfield line through to Ipswich via Ripley to create a loop potentially.
  • Extension/expansion of Rosewood line to accommodate the ongoing suburban development west of Ipswich.
  • New line out to Beaudesert (utilising the XPT/Freight corridor which would need to be duplicated and electrified)
  • I’m gonna say it… extend the Redcliffe Peninsula line so that it actually terminates in Redcliffe, by tunneling 3km east and building an underground terminus right next to the RSL.
3 Likes

Establishment of a fully funded and empowered SEQ Public Transport Authority…can we please, for the love of God, start to take Brisbane/surrounds seriously!

Agreed the Central upgrade is well overdue as soon as CRR opens with the spare capacity considering platforms 1 & 2 will only be used by Cleveland services they should start that immediately.

I agree on the GC station upgrades especially given that like Helensvale is the busiest station outside of Brisbane!

1 Like

This is one that I’ve mentioned a couple times here and although it sounds a bit wacky and quite complicated…

Remake Airport Junction for connection to CRR.

I know, I know, sounds utterly silly, but I’m still not fully convinced about how CRR will remove the historic GC - BNE connection only for it to be given to… Ipswich?

The current Airport junction is also a bit of a mess, being flat and blocking movements on the suburban pair, limiting throughput for T4 services to Northgate and Shorncliffe.

I see an opportunity to bring the whole Eagle Junction area back to the drawing board, with a more efficient grade-separated junction flyover for airport services, an easier connection to Doomben (if it doesn’t get converted to a busway…), a full rebuilding of EJ (with a renaming to Kalinga while at it), etc, etc.

But I do firmly believe that the first thing to do post-CRR is the full quadrupling of Sector 1 for both north and south. Non-negotiable.

People say that few loadings from BNE reach the Gold Coast because most get off in central Brisbane but I still think the amount of loadings reaching Gold Coast would be greater than any other distal terminal. I highly doubt Ipswich is going to exceed GC’s loadings reaching BNE

OOL isn’t really even a defence against cutting GC’s direct access to BNE because BNE is still the overwhelming amount of SEQ’s international flight loading

I can’t see it working in any viable way but I’d also support maintaining GC’s direct connection to BNE

Quad tracking between Kuraby and Boggo Road with the removal of all the level crossings. At a minimum if they don’t want to redo just completed parts Quad tracks between Kuraby and Coopers Plains that’s where most of the removal crossings are anyways

I would also say with a GC station upgrades they need to look at parking Helensvale and Hope Island are considerably bad. Hope Island you often can’t get a car park past 7 am

You can say the same for most if not all the Gold Coast stations. Let’s say they increased parking upwards instead of outwards (which would be preferable).

Many of these stations are connected via roads that are a single lane each way, meaning the roads connecting them chockers in morning/afternoon rush hours. More parking would be nice but the traffic on the local connecting roads is already so bad.